|
The main objectives of the RailCalc project are two: |
|
Read more...
|
|
|
The Railway Directives 2001/12/EC and 2001/14/EC provided a general framework for setting rail infrastructure charges, i.e. charging costs of operation (i.e. marginal cost) as a minimum and full cost as a maximum. |
|
Read more...
|
|
|
In order to achieve the three main objectives of the study, a three-phase methodology has been developed. |
|
Read more...
|
|
|
The scope of the RailCalc project includes all Member States of the EU.... |
|
Read more...
|
|
|